Bosnia; Power utility company EPHZHP marks positive results for 1/2Q 2013, HPPs produced max

20. August 2013. / SEE Energy News

Half-year business plan for 2013 was adopted on the session of Supervisory Board PC “Elektroprivreda HZ HB” the power utility company of Bosnian Croat entity .

Good business results are 35MEUR worth and it is almost three times higher than business income in 2012.

Such results are a consequence of very god hydrology conditions especially during winter months in 2013, excellent operative readiness of production objects, decrease of electricity supply in calculation period of almost 60% with the reference to the same period 2012 with accomplished degree of payment from buyers on distribution voltage heights of 106,07% as well as decrease of all business expenses that were able to influence on.

7 hydro power plants in EP HZ HP System have produced 1.690 GWH in the first half of the year which is 2,27 times higher than planned (745 GWH).

 

Source; Serbia Energy See desk/EPHZBH

Download as PDF :

Download PDF