Bosnian TPP Gacko maintenance work, power gen facility out of system for 70 days

18. July 2012. / SEE Energy News


In Gacko TPP, at the end of June, electricity production has been stopped because of repair. According to leaders of the company, professional teams should repair milibar equipment till the beginning of Septembre.

No damage

First inspection after the openning of the turbine block, didn

Download as PDF :

Download PDF