EU Court of Justice ruled that Bulgaria should not have granted TPP derogations
, SEE Energy NewsThe Court of Justice of the European Union said that Bulgarian authorities should not have granted a derogation to coal-fired thermal power plant Maritsa East 2 to allow it emitting sulfur dioxide above the EU limits.
The ruling said that, when considering a request for a derogation, the competent authority must refrain from granting such a derogation when that derogation is capable of contributing to exceedance of the air quality standards or being contrary to the measures included in the plan intended to ensure compliance with those standards.
The court ruling was given at the request of environmental organizations Greenpeace Bulgaria and Za Zemiata, following a derogation granted by the Bulgarian Government in 2018.
In 2020, the EU Commission referred Bulgaria to court over the country’s failure to comply with a previous court ruling which found it in breach of the EU’s air quality legislation.
In May 2022, the EU court ruled that Bulgaria contravened EU rules on air pollution in its failure to address sulfur dioxide pollution from coal-fired power plants.
Bulgaria has four large coal-fired power plants: Maritsa East 2, ContourGlobal Maritsa East 3, AES Galabovo and Bobov Dol. With a total installed capacity of 4,119 MW, these power plants represent 31.7 % of the country’s total electricity generation capacity.
Sign up for updates & special reports
LATEST NEWS
- March 21, 2023 SEE Region, Drop in gas power plant production by 28 percent, to 3.5 TWh in the 10th week
- March 21, 2023 Slovenia, HSE will invest 2 billion euros in renewable energy sources by 2033.
- March 20, 2023 Kodar Energomontaza awarded EPC contract for upgrade of Belgrade high voltage supply network