In March 2026, the Krško Nuclear Power Plant, jointly operated by Slovenia and Croatia, produced a total of 521,396 MWh of net electricity, exceeding the planned output of 515,000 MWh by 1.24%.
For comparison, in March of the previous year, the plant generated 520,951 MWh, which was also above the planned level by 0.91%, indicating consistently stable operational performance.
The plant operated within all required technical specifications, with all safety systems fully functional throughout the reporting period. Both the availability factor and the capacity factor reached 100%, reflecting uninterrupted operation and high reliability.
No technical issues were reported during the month, confirming the continued stable and efficient performance of the facility under normal operating conditions.