In April 2026, the Krško Nuclear Power Plant, jointly operated by Slovenia and Croatia, generated a total of 501,498 MWh of net electricity. This output was slightly above the planned level of 500,000 MWh, exceeding the target by 0.3% for the month.
In the same period last year, the plant produced 503,994 MWh of net electricity, which was also close to expectations, although it fell slightly short of its planned figure of 515,000 MWh, representing a deviation of 0.8%.
The plant continued to operate under strict technical specifications, with all safety systems fully functional throughout the reporting period. Both the availability factor and the capacity factor remained at 100%, indicating stable and uninterrupted performance. No technical issues or operational disruptions were reported during the month.