The Government of the Central Bosnia Canton announced a public call for the concession to build wind farms in locations Ranca- Dobretici- Vitovlje Malo, municipalityTravnik, Jajce and Dobretici, with 200 MW of installed capacity, it was announced on the website of the Government.
The concession for wind power is granted for a period of up to 30 years.
After getting the concession, the concessionaire commits to carry out the measurement of wind potential, design and build a wind farm, which will use in accordance with the provisions of applicable regulations by which it is regulated the field of RES use and to solve property relations before entering the property, to obtain the required permits and approvals in accordance with applicable regulation.
The concession is awardedwith the concession fee at least 1.5% of the total generated electricity calculated on the basis of the currently valid redemption price for RES.
The concession is given to the system D.B.O.T. (Design, Build, Operate, Transfer) so that the concessionaire, after the expiry of the concession, will transfer constructed buildings and facilities to the Central Bosnia Canton with the accompanying documentation.