Serbia: GazpromNeft NIS delays mining rent fees payments?

Serbia: TPP Morava overhaul project 20MEUR to extend operation cycle

Serbia: World Bank claim Tamnava open mine pit water pumping financed project is clean, story revealed

EPS TPP Kostolac, tender: Design and Consulting Services “The drafting of hydro-construction conceptual design of water drainage from the Mlava and Danube coast, northwest of the contours of the Drmno open mine pit

Power utility EPS, tender: “Justifiability Study with conceptual design of reconstruction in order to extend the operational life and increase of the block 4 (308.5 MW ) in TPP Nikola Tesla A”

Power utility EPS, tender: drafting of study “Eco-remediation plan of “Brownfield” investment locations of EPS”

Power utility EPS, tender: Preparation of design study “Use of ash produced in TPP PE EPS for the construction and reconstruction of hydro-technical structures”

Serbia, SEE: Guidelines for Determining VAT for Transactions Related to Cross-Border Electricity Exchange in Energy Community

Serbia:Power utility EPS tender for IT system for electricity billing under public investigation

Serbia: Tender for electricity billing raises fierce investigation of EPS power utility